As promised here are some pictures of the lil' guy.
First thing I did was install a 12v outlet for our phone and e-reader needs.
Here you can see my blob of a finger, and in the background you can see what used to be the refrigerator. That was removed because it didn't work anymore. I left the outlet in the back, but sealed up the vents. As you can see we put some storage bins in there.
So since we don't have the refrigerator I installed this rack to hold 2 coolers in the shower area. I have some hose to connect to the drain of the coolers as needed.
I couldn't get this all in one picture because of the close quarters. I don't have a before picture, but it was pretty nasty. there was a leak from one of the marker lights.
It was completely gutted. I re-insulated with blue foam insulation. The wall was 1/4 luan, the floor was scrap 1/2 plywood and the back wall/ ceiling was the plastic white board.
Also the floor was really soft. I laid down 2 layers of plywood roughly 3/4 total thickness.I had to "puzzle" cut it to get it to fit. I covered it was some cheap stick on tile.