Home          Forums          Files          Photos          Marketplace          Support          About


Sunline Factory Tour Photos
Page 2 of 2

Page 1


Hardwoods laminated on the outside - these were waiting to be stained


Installing the heat and electrical systems

Heating ducts being run


Etched glass in the doors - the cabinet doors are the only thing that Sunline farmed out besides the metal frame

Screwing the framework together

Sheets of laminate waiting to be used


Slide-outs pre-built waiting to be installed


Solid construction


Stapled, glued and screwed - something not everyone does


Sunline TT waiting for the roof to be installed

Routing out the 24' long piece of OSB - this is where you won't ever see the difference in extra time and materials

Two-way shades and screens - another indication why Sunlines are higher-end trailers

One-piece solid roof

Final inspection area - you can see the hoses hooked up to the front for pressure testing of all the lines

This is the last run before they leave the facility

Ours is the all white one in the middle - we chose to not have them put any graphics on the fiberglass so we could have custom graphics installed - the only thing they had on was a Sunline logo on

Looking out the back window of our new 2499 in the Sunline lot


Full service facility





Copyright © 2006 Sunline Owner's Club. All rights reserved.
Content on SunlineClub.com is copyrighted and may not be reproduced without written permission.
This website is not affiliated with the Sunline Coach Company of Denver, PA.
For the official Sunline Coach Company Website, please visit http://www.sunlinerv.com