Thanks to Pat Bonish of Milford, MI for these photos and descriptions.
Click any photo for a larger version.
 Welcome to Sunline
|
 From start to finish, everything's built here
|
 Bare frame waiting for body
|
 The assembly line where the units would roll down the line - you can see the different stages of construction - notice the tag on the tongue jack which displays the model
|
 This is the beginning of the assembly line - bare frames were delivered from metal factory that moved down the street just to be closer to Sunline |
 Top grade lumber used for assembly
|
 That's a 24' piece of OSB
|
 Sunline worker standing in the middle of the assembly line - notice that this model doesn't have a fully supported roof
|
 Outside framing section of the assembly line
|
 Frame built construction like a house
|
 Assembled frames ready for instalation - frames are all pre-assembled by one person to speed the process up
|
 Window and door surround section
|
 Unit getting wired up on the underside - they would build in right-side up untill they got to this point and then turn the entire trailer on its side and finish wiring the underside
|
 Cabinets waiting to be installed - cabinets are framed like homes to keep weight down and create a stiffer product
|
 Cindy & Carl watching the units being built - the upstairs was where the carpenters pre-built the sections and downstairs was where the units were put together
|
 Carl & Cindy standing beside the one piece rubber roofing material
|
 Insulating the Roof
|
 Notice the Sunline worker sanding a piece so everything lines up perfect - you can also see the different models in various stages
|